Pipe replacement at glassworks

23. 8. 2023
< 1 min.
Kristina Luskacova

We replaced gas, oxygen and cooling pipes for Schott AG, a German multinational glass company. We also connected the pipes from the gas tank to the glass furnaces for the client.

Customer profile

Kramer & Best Anlagenbau GmbH, a German company, offers an extensive portfolio of services specialising in turnkey plant construction. It provides consultation, engineering and project management, manufacturing and assembly, including solutions for complex maintenance concepts and demanding projects. The company prides itself on efficiency, availability, productivity and long-term partnerships.

Execution

Project preparation

The first phase contained preparing individual pieces of piping, pre-assembled on our premises for more efficient work at the client’s.

Course of execution

We brought work containers to the glassworks, in which welders began to weld pre-assembled pieces of pipes. The project management elaborated the drawings and phrases for the gas pipeline in detail.

This was followed by gradual delivery of the remaining material (pipes with dimensions of 25-250) to ensure a smooth replacement process.

Most of the welding work was done using the TIG 141 process. Pipes made of both low-alloy and high-alloy steels were installed in the interior of the glassworks, including copper pipes soldered using the 912 process.

Difficult conditions

A large part of the work took place at heights, as most of the pipes ran along bridged structures. It was extremely important to put great emphasis on occupational safety.

Inspection mechanisms

X-ray weld tests were carried out during pipe assembly.

Result and continued cooperation

The pipe replacement project continues after the end of the first phase. The pipes must be renewed due to the gas tank wear.

Take a look also at

Manufacture of aircraft components
25. 11. 2023

Manufacture of aircraft components

We welded serial drive funnels of braking flaps for Orličan s.r.o., a traditional Czech aircraft manufacturer. Execution The customer supplied special…

Read more
Steel structures in the shopping park in Litvínov
10. 9. 2023

Steel structures in the shopping park in Litvínov

We prepared steel structures and railings for the new Stop Shop shopping park in Litvínov. The contract included the production, supply of material and…

Read more
Production of silos and belt conveyors for a concrete plant
20. 2. 2019

Production of silos and belt conveyors for a concrete plant

We completed a comprehensive contract for the production and assembly of belt conveyors and silos for TGB Plzeň Transportbeton s.r.o., a Czech…

Read more